FAQs about the New Library building
When will the current library close?
The library will close Monday, April 19, 2021 in preparation for moving into the new Chili Community Center.
When will the new Chili Community Center open?
The new Chili Community Center will open Saturday, May 15, 2021. Stay tuned for details of the Grand Opening!
Where is the new community center located?
The new Chili Community Center will be off Old Scottsville Chili Road, essentially behind Target.
What will the library staff be doing while it is closed to the public?
The Library will be tearing down, relocating, and installing new and existing shelving. We will be moving the library’s collection, furniture, and contents. We will also be disconnecting, moving, and installing the Library’s new and existing computers, monitors, servers, and network equipment.
What will be the library’s new address and phone number?
The library’s address will be 3237 Chili Avenue, and our phone number will continue to be
(585) 889-2200.
(585) 889-2200.
What will be the new library’s hours?
The library will be open:
Monday through Thursday 9:00 AM – 9:00 PM
Friday* and Saturday 9:00 AM – 5:00 PM
Closed Sunday
*First Friday of the month closed 9:00 AM – 11:00 AM
Monday through Thursday 9:00 AM – 9:00 PM
Friday* and Saturday 9:00 AM – 5:00 PM
Closed Sunday
*First Friday of the month closed 9:00 AM – 11:00 AM
Where can I return library items?
On April 19, 2021, the Chili Library’s book drop will be closed. After that date, please return items to other Monroe County Library System libraries. When the library reopens, you can return items to our drive-up book drop, or within the library during open hours.
What is the due date of items I checked out of the library?
Items checked out from March 29 – March 31 will be due May 22
Items checked out from April 1 – April 7 will be due June 1
Items checked out from April 8 – April 14 will be due June 5
Items checked out from April 15 – April 18 due June 12
Items checked out from April 1 – April 7 will be due June 1
Items checked out from April 8 – April 14 will be due June 5
Items checked out from April 15 – April 18 due June 12
Can I place a hold on an item while the library is closed?
After April 8, 2021 the library will not be a pick-up branch until it reopens to the public.
What new improvements can I expect in the new library building?
The library will have a lot of new spaces to enjoy, and will continue to be a community destination for lifelong learning and engagement.
New to the Chili Public Library:
New to the Chili Public Library:
- Increased space for materials and programming
- A Reading Room with two-sided fireplace
- Upgraded electrical and computer network
- Study rooms for individual and small group work
- Additional programming space
- A play area in the Children’s Room
- A Teen Room with a gaming center
- A drive-up book drop
- A Makerspace Room